Under the Florida Statutes, a resale condo buyer in Florida can cancel the contract in writing within seven days of signing it and receiving the association's documents. Weekends and legal holidays don't count toward those seven days. The right can't be waived, and it ends at closing. In Okaloosa County this fall, those seven business days are when a buyer learns what a Gulf-front unit will really cost. Many associations are adopting 2027 budgets under reserve rules that no longer allow them to skip funding, as set out in the Florida Statutes. December 31, 2026 is also the outside date for older owner-run associations that folded their first structural integrity reserve study into a milestone inspection due this year.
For a condo near the water here, the list price is only the first number. The association's paperwork decides the rest of the payment, and a coastal building in Okaloosa reaches that paperwork sooner than the state default.
The coastal clock starts five years early
The Florida Statutes require a milestone inspection once a residential condo or co-op building of three or more habitable stories turns 30, and every 10 years after that. The statute also lets the local enforcement agency require the first inspection at 25 years when local conditions call for it.
Okaloosa County uses that option. Under the county's published instructions, buildings within three miles of a coastline need their first inspection at 25 years. Buildings more than three miles from the coast wait until 30. The high-rises on Okaloosa Island and the Gulf-front towers in Destin are all inside that three-mile band. A tower that would get five more years almost anywhere inland is already due.
There are two phases. Phase One is a visual check by a licensed Florida architect or engineer, paid for by the association. Phase Two happens only when Phase One finds significant deterioration, and it can include testing and repair recommendations. If Phase Two calls for repairs, they must begin within 365 days. A sealed report goes to the Okaloosa County Building Official, and owners receive a summary.
That 365-day requirement is where a building's timeline meets a buyer's. A Phase Two report signed this year can mean scaffolding and an assessment vote within roughly a year of your closing.
Why October through December is when the bill gets set
Under current law, the owners of a unit-owner-controlled association that must have a structural integrity reserve study, or SIRS, can't vote to waive or underfund reserves for the structural items that study covers in any budget adopted on or after December 31, 2024. A shortfall can be covered with regular assessments, special assessments, a line of credit or a loan. Special assessments, loans and lines of credit need a majority vote of the association's total voting interests.
Before that change, owners could vote to cut reserves. For years the law has required this warning, in bold capitals, on any proxy asking owners to waive reserves:
WAIVING OF RESERVES, IN WHOLE OR IN PART, OR ALLOWING ALTERNATIVE USES OF EXISTING RESERVES MAY RESULT IN UNIT OWNER LIABILITY FOR PAYMENT OF UNANTICIPATED SPECIAL ASSESSMENTS REGARDING THOSE ITEMS.
Buildings that relied on those waivers are now writing budgets without them. Here is the calendar for an association whose fiscal year starts January 1:
- Now through November. Boards send budget meeting notices. Owners must receive the notice and a copy of the proposed budget at least 14 days before the meeting.
- Any meeting that will consider a special assessment. The notice must say assessments will be considered and must give the estimated cost and what the money is for. A nonemergency special assessment needs written notice at least 14 days ahead.
- By mid-December. The board must adopt the annual budget at least 14 days before the fiscal year begins.
- December 31, 2026. Owner-controlled associations that existed by July 1, 2022 had a general SIRS deadline of December 31, 2025. Those with a milestone inspection due by the end of 2026 could complete the SIRS alongside it, but no later than this date. After that first study, a SIRS is required at least every 10 years.
Some associations run on a different fiscal year, so ask for the actual budget date. If you go under contract in October or November, you may sign while one budget is in effect and close under the next one.
One provision often gets misread. If a proposed budget raises assessments above 115 percent of the prior year, the board must also offer a substitute budget without discretionary spending. Required reserves, insurance premiums and certain nonrecurring repair costs are left out of that 115 percent math. That means the costs most likely to drive a large increase on a coastal tower are the same costs that don't trigger the substitute-budget option.
There is some relief. For budgets adopted on or before December 31, 2028, an association that finished a milestone inspection within the previous two calendar years can vote, by a majority of total voting interests, to pause or reduce reserve contributions for up to two consecutive budgets to pay for the recommended repairs. That option isn't available to developer-controlled associations, associations where nondeveloper owners have been in control for less than a year, or associations controlled by bulk assignees or bulk buyers. A pause makes monthly dues look lower. It doesn't make the repair cost any smaller. And before contributions resume, the association must get a new SIRS.
What to read first in the package
Florida entitles a resale buyer to a set list of documents: the declaration, articles, bylaws and rules, the latest annual financial statement and budget, the inspector-prepared milestone inspection summary where one applies, the latest SIRS or a statement that none was done, any turnover inspection report, the required FAQ document, and the governance form. With seven business days to work with, read them in an order that turns up the cost questions first:
- The milestone inspection summary. Check whether the building stopped at Phase One or went to Phase Two. If it went to Phase Two, the 365-day repair requirement applies.
- The SIRS, or the statement that none exists. If there's no SIRS for a building of three or more stories, ask when it is scheduled. For an older owner-run association using the milestone option, the legal outside date is December 31, 2026.
- The annual financial statement. Any special assessment, line of credit or loan taken to fund reserves has to appear in it.
- The current budget, and any proposed 2027 budget. Compare the reserve lines to the SIRS funding plan. The law requires an updated SIRS before an association adopts a budget whose reserve funding doesn't match the most recent study.
- Posted meeting notices. Ask for every notice issued since the contract date. A notice for a meeting where assessments will be considered must state an estimated cost.
The contract also has to address whether the milestone, SIRS and turnover reports have been completed. After receiving certain reports, a buyer can ask for a closing extension of up to seven days. A contract that misses the statutory disclosures is voidable before closing.
Reading a reserve study with a contractor's eye
A SIRS is based on a visual inspection. It has to cover the roof, the structure, fireproofing and fire protection, plumbing, electrical, waterproofing and exterior painting, and windows and exterior doors. It also covers any other item over the $25,000 threshold, adjusted for inflation, whose failure would harm those systems. For each item, it must give the remaining useful life, the estimated replacement or deferred maintenance cost, and a funding plan that at minimum keeps the reserve cash balance above zero.
From a builder's point of view, the useful-life column says more than the total. When a roof and a waterproofing system are both near the end of their lives in the same few years, the funding plan has to raise a lot of money quickly. If the reserve balance lags that schedule, the gap gets filled by an assessment or a loan, and the vote may happen after you own the unit.
Waterproofing is the line most likely to become scheduled work on a Gulf-front tower. At Emerald Towers West in Fort Walton Beach, an owner's rental notice on Emerald Coast by Owner says the association has scheduled exterior restoration from about November 2, 2026, through mid-January 2027, weather permitting. The work includes recoating walkways and private balconies, with possible balcony and walkway restrictions while the coatings cure. That schedule comes from an owner, not from the association, so a buyer should confirm the scope and funding in the association's own records.
O'Connell Engineers, an Okaloosa engineering firm, lists completed milestone inspections, SIRS or reserve studies for Emerald Towers West, Emerald Towers Owners, Oceania, East Pass Towers I and II, Pelican Isle and Islander Beach Resort. Its portfolio also includes exterior restoration at Shoreline Towers in Destin across three 12-story towers and ten townhomes. The list doesn't say which study each building received, and it gives no assessment amounts. It does show that the studies are being done on buildings buyers here are already touring.
What the August numbers say about leverage
In August 2026, the Crestview–Fort Walton Beach–Destin metro area had 118 closed condo and townhouse sales, up 15.7 percent from August 2025. The median sale price fell 6.8 percent to $489,500. For the year to date through August 2026, closed sales were 834, up 7.3 percent, with a median of $510,000, up 1.3 percent. These figures combine Okaloosa and Walton counties and include townhouses, so they describe the region rather than any single tower.
More units are selling, and August's median came in below the year-to-date figure. A buyer who has read the SIRS can bring up a scheduled restoration or a thin reserve balance with documents in hand. A seller whose association has a current study, a funded plan and finished repairs can show that too, and that clarity is worth something. The next metro release is scheduled for October 16, 2026.
The core rules haven't changed this year. The 2026 bill that amended these statutes, SB 104, was a reviser's bill. The Florida Senate's analysis describes its changes as technical and nonsubstantive.
Timing an offer around the association's calendar
If you're writing an offer between now and the end of the year, tie the timeline to the documents. Ask the seller for the milestone summary and the SIRS status before you sign, so the seven-day window is spent reviewing what you already expected. Ask whether a budget meeting or assessment meeting has been noticed. If a Phase Two report exists, ask whether the repairs have started, since the county's 365-day rule applies. If reports arrive late in the process, request the seven-day closing extension in writing.
Sellers can do the same work in reverse. Gather the summary, the study, the financial statement and any posted notices before listing, so a buyer's review fits easily inside seven business days.
If you have an Okaloosa Island, Fort Walton Beach or Destin condo in mind, I'll go through the milestone summary and the reserve study with you line by line, with a contractor's eye on roofs, concrete and waterproofing, before your cancellation window closes. Let's Connect with Johnnette Acree.
This article is general information, not legal, tax or financial advice. Consult a qualified professional about your situation.